Translate

วันพฤหัสบดีที่ 12 กรกฎาคม พ.ศ. 2555

CBDRM Workshop in Ko Nong Village and Kor Thung Village, Lamphun Province on 5-8 March, 2012

On 5 to 8 Mar, 2012, CBDRM (Community Based Disaster Risk Management) Workshop was held at Ko Nong Village and Ko Thung Village in Ko sub-district, Li District, Lamphun province.

Early warning and evacuation plan including community risk map was prepared through the workshop.

Disaster Prevention Criteria Bureau had a lecture about the relationship between rainfall amount and river water depth and simulated flood hazard.

To test the early warning and evacuation plan, Evacuation Drill was conducted on the last day.


Writing Community Disaster History 

Introduction of Hazard Mapping for Lao Trainee 

TF-5 Introduced the Hazard Map Based on Flood Simulation as Potential Flood Risk 

The Existing Risk shown on the Risk Map in Kor Thung Village  

The Village Headman of Kor Thong Village explaining Community Action Plan  

The Village Headman of Ko Nong Village explaining Community Action Plan 

The Facilitator Introducing the Warning Information Dissemination System in Each Village 

The Early Warning and Evacuation Plan Prepared Through This Workshop 

An Emargency Meeting for Flood Response (Evacuation Drill)  
For further pictures, please visit our google+ page.

Find us on Google+

ไม่มีความคิดเห็น:

แสดงความคิดเห็น